Página de inicio Proyectos

2026 Tiger Hu Nationwide Concert Tour — Multi-City Stage Automation

2026 Tiger Hu Nationwide Concert Tour — Multi-City Stage Automation

Jul 30, 2026

Project Overview

For Tiger Hu’s multi-city live concert tour across major arenas in China (including Beijing, Shanghai, Shenzhen, Tianjin, and Nanjing), YZDITEC delivered a highly repeatable stage automation system. Utilizing 20× TÜV-certified C1 smart servo hoists alongside two Black Warrior show control consoles, the setup drove kinetic overhead rigging and synchronized multi-level floor-lifts with exceptional reliability night after night.


1.Dual-Console Architecture & Dynamic Rigging

The system deployed two independent consoles to split spatial operational loads:

  • Console 1 (Overhead Systems): Managed 20× C1 servo chain hoists driving 5 motorized lighting rig groups (4 hoists per group; max tilt 40°) and a V-shaped LED screen. Powered by EtherCAT control, the system provided ultra-quiet operation and sub-millisecond positioning accuracy.

lighting trussKinetic lightingMotorized lighting rigsStage rigging lighting truss


  • Console 2 (Floor-Lift Systems): Integrated 7 rigid chain lift stages (utilizing 12 motors) featuring dual-deck sync travel from -1700mm to +3000mm.

motorized lifting stagerigid chain stage liftslive concert productionRigid chain lift stages


To streamline touring efficiency, the venue setups relied on our 3D simulation software for full offline pre-visualization, ensuring exact motion-cue translation at every tour stop.

3D simulation of lighting rigs3D simulation of rigid chain stage lifts


2.Cross-Vendor Compatibility & Multi-City Tour Repeatability

A major technical obstacle during the tour was integrating third-party ground lifts into our control workflow. Using standardized EtherCAT ESI device profile files, the Black Warrior console seamlessly patched into external drives—enabling unified control over 7 multi-tiered lift stages without replacing hardware.

This cross-vendor compatibility, paired with absolute positioning encoders, eliminated the need for repetitive zero-point homing during load-ins. Across every city on the tour, operators simply reloaded pre-programmed cue files into the stage automation console, achieving identical, rock-solid execution with zero timing drift.
To View the Live Demo

Dejar un mensaje

Dejar un mensaje
Déjanos un mensaje, te responderemos lo antes posible.
entregar
CONTÁCTENOS :ysstagetech@gmail.com

Página de inicio

Productos

whatsApp

contacto